Local Projects

What We Offer > Engineering Services

Project Name
Project Owner
Project Location
Contract Amount
Date Started
Date Completed
Status

: Construction of Classroom Building Ligas & Queensrow Elementary School
: DPWH Cavite, Engineering District-Owner
: Trece Martirez, Cavite Philippines
: 0.52M
: 11-May-93
: 01-June-93
: Completed

: Replacement of 1 Standard Classroom Building
: P.F. Espiritu Elementary School DPWH Cavite, Engineering District
: Trece Martirez, Cavite Philippines
: 0.36M
: 20-July-93
: 30-June-93
: Construction of Classroom Building Ligas & Queensrow Elementary School
: DPWH Cavite, Engineering District-Owner
: Trece Martirez, Cavite Philippines
: 0.52M
: 11-May-93
: 01-June-93
: Completed

: Replacement of 1 Standard Classroom Building
: P.F. Espiritu Elementary School DPWH Cavite, Engineering District
: Trece Martirez, Cavite Philippines
: 0.36M
: 20-July-93
: 30-June-93
: Completed

: Concreting of Diamante Street
: DPWH NCR Manila South Engineering District
: San Andres Manila, Philippines
: 1.00M
: 20-July-93
: 13-Oct-93
: Completed

: Fabrication and Delivery of Steel Railings
: Philippine Overseas Employment Administration
: POEA Building, Ortigas Avenue cor. EDSA Mandaluyong City, Philippines
: 0.25M
: 23-Jun-93
: 21-Jul-93
: Completed

: Prov. of New Overhead Water Pipelines
: Philippine Overseas Employment Administration
: POEA Building, Ortigas Avenue cor. EDSA Mandaluyong City, Philippines
: 0.20M
: 21-Jul-93
: 17-Aug-93
: Completed

: Two Storey Residence Building
: Mr. and Mrs. Al Rashid Cayngcat-Owner
: St. Francis Homes, Canlalay Biñan, Laguna, Philippines
: 1.15M
: 10-Mar-94
: 10-Jun-94
: Completed

: Site Development/Low Cost Housing
: Balaybay Resettlement Project
: Balaybay, Zambales, Philippines
: 101.00M
: 15-Oct-94
: 15-Dec-95
: Completed

: Site Development/Low Cost Housing
: Mawaque Resettement Project
: Mawaque, Mabalacat Pampanga, Philippines
: 120.00M
: 10-Feb-94
: 30-Aug-94
: Completed

: Site Development/Low Cost Housing/Classroom
: Madapdap Resettlement Project
: Mabalacat Pampanga, Philippines
: 205.00M
: 30-Jun-95
: 30-Oct-96
: Completed

: 65 Units Bunkhouse Cabcom Resettlement
: Clark Airbase, Mabalacat, Pampanga Philippines
: 28.50M
: 31-Jul-95
: 15-May-96
: Completed

: Repair/Rehabilitation and Extension of Ports
: South Harbor Piers 3,5,9, and 15
: Philippines
: 15-Jun-94
: 27-Feb-95
: Completed

: Dumping Platform Project
: Carmona Sanitary Landfill
: Carmona, Cavite, Philippines
: 2.80M
: 20-Apr-96
: 10-Jun-96
: Completed

: Digitel NX-2 Project
: Civil Works, Pipe Laying, Manhole Installation
: Alaminos, Binmaley, Bolinao, Bugallon, and Mangatarem Pangasinan, Philippines
: 30.00M
: 10-Oct-96
: 30-Jan-97
: Completed

: FVR Kabuhayan Factory
: Livelihood Project Phase 1
: Mabalacat, Pampanga, Philippines
: 150.00M
: 10-Oct-96
: 25-Jan-97
: Completed

: Toyota Motors Corporation Philippines
: a. Dealers Office / b. Security Guard House, Riprap Fence, Main entrance, Press Foundation, Die Making Plant, etc.
: Sta. Rosa, laguna, Philippines
: 60.00M
: 06-Jun-96
: 30-Sept-97
: Completed

: Digitel NX-2 Priority 1 and 2 Project (40 sites)
: Civil, Electrical and Mechanical Works Fire Alarm and Security System
: Region 4 and 5
: 210.00M
: 09-Sept-96
: 07-Apr-99
: Completed

: DPWH Palawan Project
: Road Construction Concreting
: Philippines
: 3.80M
: 10-Oct-96
: 28-Feb-97
: Completed

: Yakult Philippines
: Yakult Expansion Plant
: Bo. Makiling, Calamba
: Laguna, Philippines
: 20.00M
: 20-Jan-97
: 31-Mar-98
: Completed

: 38 and 39 Storey KSA Tower
: Manpower Supply
: Ayala Avenue, Makati City Philippines
: 10.00M
: 14-May-97
: 07-Dec-98
: Completed

: Philippine National Construction Corporation
: Q.I. Warehouse
: E. Rodriguez, Quezon City
: 5.00M
: 07-Oct-97
: 07-Oct-98
: Completed

: AFP Engineering Task Force Mt. Pinatubo
: Construction of Road, Bridges, and Water Supply
: Mawaque Rsettlement Project Mabalacat, Pampanga, Philippines
: 130.00M
: Feb-95
: Mar-97
: Completed

: AFP Engineering Task Force Mt. Pinatubo
: Construction of Water Supply System
: Madapdap Resettlement Project Mabalacat, Pampanga, Philippines
: 157.00M
: 10-Jan-97
: 30-Jun-98
: Completed

: AFP Engineering Task Force Mt. Pinatubo
: Construction of Water Supply System
: Balaybay Resettlement Project Mabalacat, Pampanga, Philippines
: 35.00M
: 16-Mar-97
: 30-Apr-98
: Completed

: Four Storey Manila Bulletin Building
: Rehabilitation Works
: Intramuros Manila, Philippines
: 49.00M
: 08-Dec-97
: 29-Feb-99
: Completed

: Laguna Metts
: Labor and Materials
: Laguna Technopark, Philippines
: 3.00M
: 02-Jan-98
: 28-Mar-98
: Completed

: Tap Gymnasium
: Labor and materials
: Laguna Technopark Philippines
: 7.00M
: 16-Jan-98
: 19-May-98
: Completed

: Clark International Airport
: Arrival and Departure Areas Philippines
: 3.00M
: 05-Aug-98
: 30-Sept-98
: Completed

: Mitsubushi Heavy Industries
: Manpower Supply
: Cainta, Rizal, Philippines
: 3.30M
: 25-Mar-98
: 25-Oct-98
: Completed

: Pampanga Delta Development Project – NIA
: Gated Weir Civil Works
: Brgy. Laqious, Arayat Pampanga Philippines
: 35.00M
: 28-May-98
: 30-Sept-99
: Completed

: Tosoh Factory Project
: Site Development / Factory & Admin Building / Warehouse Building / Change House and Power Station Civil and Architectural Works
: Marlavar, Batangas, Philippines
: 30.00M
: 15-Aug-98
: 30-Apr-99
: Completed

: 29 Storey Sky Plaza Building
: Building Works
: Ayala Avenue, Makati City Philippines
: 30.00M
: 01-Aug-98
: 30-Mar-99
: Completed

: Manila Prince Hotel
: Renovation Works of Basement / Disco Bar / Function Room and Meeting Room / Civil and Architectural Works
: Roxas Boulevard, Manila, Philippines
: 4.00M
: 01-Oct-98
: 15-Mar-99
: Completed

: Manila Hotel Mabuhay Chinese Restaurant
: Renovation Works / Architectural and Interior Design
: Roxas Boulevard, Manila, Philippines
: 5.00M
: 01-Oct-98
: 15-Mar-99
: Completed

: Honda Parts
: Site Road Works, Covered Parking with Maintenance Shop
: Philippines
: 5.00M
: 01-Mar-99
: 15-Jun-99
: Completed

: Bataan Polyethylene Plant Project
: Reactor, Cooling Tower, U-Ditch Raw Water Treatment, & Civil Works
: Petrochemical Complex Mariveles, Bataan, Philippines
: 35.00M
: 01-Jan-98
: 28-May-00
: Completed

: NIDEC Factory Expansion
: Site Development / Building Structure & Architectural Works
: Laguna Technopark, Sta. Rosa Laguna, Philippines
: 25.00M
: 17-May-99
: 30-Dec-99
: Completed

: Sohbie Kohgie Philippine Factory
: Administrative and Canteen Building Civil and Masonry Works
: Lipa Technology Center, Lipa City Philippines
: 30.00M
: 01-Aug-99
: 30-Apr-00
: Completed

: Four Storey AMACC Building - Gen Con
: Civil, Architectural, & Specialty Works
: Pasong Putik, Project 8 Quezon City, Philippines
: 34.00M
: 01 Sep-99
: 30-Apr-00
: Completed

: Yakult Philippines
: Construction of Warehouse # 2
: Bo. Makiling, Calamba Laguna, Philippines
: 5.90M
: 17-Apr-00
: 23-Sep-00
: Completed

: Water Conveyance System
: Drift Irrigation, Dam, Piping System and Distribution of 17km pipes
: Mt. Kitanglas Agri Ventures Inc. Philippines
: 38.00M
: 04-Nov-99
: 04-Nov-00
: Completed

: Construction of 17.2 km Provincial / Municipal Roads
: Road Construction
: Province of Camarines Sur Philippines
: 114.50M
: 01-Oct-99
: 14-Dec-00
: Completed

: Villamor Golf Club
: Const/Rehab 8km Golf Cart / Jogging Pathways
: Villamor Airbase, Pasay City Philippines
: 4.60M
: 05-Feb-01
: 25-Jun-01
: Completed

: AMA 1-10 Storey School Building
: Civil, Architectural, Electrical, Mechanical, Plumbing & Fire Protection Works
: Gen. Tinio Street, Bangkal Makati City, Philippines
: 177.00M
: 08-May-00
: Jan-03
: Completed

: Eastborough Place Subdivision
: 25 Hectares Site Development Earthworks and Road Works
: Mahabang Parang, Angono Rizal, Philippines
: 64.50M
: Mar-01
: May-03
: Completed

: Eastborough Place Subdivision
: 25 Hectares Site Development Water and Drainage System
: Mahabang Parang, Angono Rizal, Philippines
: 23.90M
: Aug-01
: May-03
: Completed

: Construction of Hanging Bridges, Foot Bridge, Pump Irrigation System and Small- Scale Irrigation System in the Mananga – Kotkot _ Lusaran Watershed Rehabilitation Subproject,
: Cebu City & Municipalities of Talisay & Compostela Cebu, Region VII, Philippines
: 25.00M
: 01-Dec-02
: 30-Jan-04
: Completed

: Construction of Detention Facilities for Inmates with Drug Related Cases
: Camp Bagong Diwa
: Bicutan, Taguig
: 27.50M
: Aug 2005
:
: Completed

: Accelaration and Deceleration Lanes of South Luzon Tollway
: NTI - South Luzon Tollway
: Philippines
: 3.00M
: 22-Apr-04
: May 2004
: Completed

: Construction of Philippine Veterans Bank (Branch)
: Philippine Veterans Bank
: Calamba City, Laguna
: 13.60M
: 30-May-04
: 30-Apr-05
: Completed

: Construction of 4.125km Concrete Local Roads (Supplemental)
: Province of Camarines Sur Philippines
: 25.00M
: 19-Feb-01
: 14-Dec-01
: Completed

: NAIA-IPT3
: Daidan
: External Electrical System External Sanitary System External Fire Water Line System
: Villamor Airbase, Pasay City Philippines
: 40.00M
: 09-May-01
: 31-Sept-03
: Completed

: NAIA-IPT3 - Masonry Works
: PAPCC
: Villamor Airbase, Pasay City Philippines
: 18.00M
: 24-Apr-01
: 31-Oct-01
: Completed

: Hacienda SWIP & Access Road Road Construction
: Hacienda SWIP
: Brgy. Hacienda SMI, Tabacco City Philippines
: 45.00M
: 11-Dec-01
: 20-Oct-02
: Completed

: Construction of 25 Academic School Building in the First District of Sorsogon
: Province of Sorsogon, Philippines
: 7.90M
: 15-Aug-02
: 9-Jan-03
: Completed

: Kumalarang Road Rehabilitation & Up-liftment Program and GEM-LGU USAID Funded Project
: Kumalarang, Davao
: 14.2M
: Aug-04
: Jan-06
: Completed

: Metropolitan Cebu Water District
: Cebu City, Philippines
: Sept-04
: Nov-05
: Completed

: Construction of Building Clusters for the Construction of three (3) building clusters Namely: A8 (Gardenia,) A9 (Camella) and A10 (Begonia).
: The Horizon West Ridge
: Tagaytay Midlands
: 271.07M
: 22-July-05
: 2-March-06
: Completed

: Interim City Center Project
: MDC
: Fort Bonifacio, Global City, Taguig City
: 11.5M
: 01-Mar-06
:
: Completed

: Anvaya Cove Project - Beach Wall
: MDC
: Brgy. Mabayo, Morong, Bataan
: 01-Mar-06
:
: Completed

: CamSur Ski Park - Villa Type Hotel
: Cable - Ski Park,
: Cadlan, Pili Camarines Sur
: 17-Mar-06
:
: Completed

: Kauhagan Brigde
: Provincial Government
: Kauhagan, Ragay, Camarines Sur
: 17-Mar-06
:
: Completed

: Ilawod Bridge
: Provincial Government
: Ilawod Caramoan, Camarines Sur
: 17-Mar-06
:
: Completed

: Development of Colegio De San Juan De Letran Gymnasium
: Colegio De San Juan De Letran
: Calamba City, Laguna
: Mar-06
:
: Completed

: Sigma Water Supply and Sanitation Project
: Sigma Wate
: Sigma, Capiz
:
: 05-Oct-04
:
: Completed

: Construction of LS Cabuli Lighthouse Project
: LS Cabuli Lighthouse
: El Nido, Palawan
: 1.7M
: Sept.-05
:
: Completed

: Construction of LS Salaug Lighthouse Project
: LS Salaug Lighthouse
: Sitangkai, Bongao Tawi-Tawi :
: 1.7M
: July-04
: June-06
: Completed

: Cosntruction of Globe Center
: Globe
: SM Molino, Cavite
: 1.2M
: Dec-05
: June-06
: Completed

: GLOBE Cell Sites
: Moriones, Camarines Sur
: 1.40M
: 2-Nov-03
: 30-Feb-04
: Completed
: Sipocot, Camrines Sur
: 2.00M
: 2-Nov.03
: 30-Feb-04
: Completed
: Buhi, Delos Angeles
: 1.80M
: 19-Nov-03
: 20-Mar-04
: Completed

: SMART Cell Sites
: Calatrava, Negros Occidental
: 3.10M
: 23-Sep-02
: 23-Nov-02
: Completed
: Fabrica, Negros Occidental
: 3.00M
: 23-Sep-02
: 23-Nov-02
: Completed
: Bicutan, Taguig
: 1.20M
: 5-March-03
: 30-Apr-03
: Completed
: Buho, Silang, Cavite
: 2.60M
: 1-Apr-03
: 1-Jun-03
: Completed
: Sorsogon, Sorsogon
: 1.00M
: 15-Sep-03
: 15-Nov-03
: Completed
: Sta. Elena, Camarines Norte
: 2.20M
: 15-Sep-03
: 15-Nov-03
: Completed
: Tambao/Casoocan, Catanduanes
: 0.90M
: 1-Apr-03
: 7-Jul-03
: Completed
: Bato, Catanduanes
: 0.70M
: 1-Apr-03
: 7-Jul-03
: Completed
: Camp 2, Baguio
: 1.60M
: 14-Oct-03
: 25-Nov-04
: Completed
: La Trinidad, Benguet
: 0.95M
: 14-Oct-03
: 30-Nov-04
: Completed
: Labason, Zamboanga
: 3.00M
: 24-Oct-03
: 24-Dec-03
: Completed
: Osmena, Zamboanga
: 3.00M
: 30-Oct-03
: 30-Dec-03
: Completed
: Bongao, Tawi-Tawi
: 2.70M
: 30-Oct-03
: 30-Dec-03
: Completed
: Salug, Zamboanga
: 1.00M
: 30-Oct-03
: 30-Dec-04
: Completed
: Capalonga, Camarines Norte
: 2.20M
: 30-Nov-03
: 30-Jan-04
: Completed
: Maluso, Basilan
: 2.00M
: 14-Nov-03
: 14-Jan-04
: Completed
: Kabasalan, Zamboanga del Sur
: 1.80M
: 20-Nov-03
: 20-Jan-04
: Completed
: Siocon
: 2.50M
: 3-Dec-03
: 3-Feb-04
: Completed
: Limbatong, Zamboanga del Sur
: 3.25M
: 25-Feb-04
: Sept-05
: Completed
: Gutalac, Zamboanga del Norte
: 1.50M
: 25-Feb-04
: Sept-04
: Completed
: Tampilisan, Zamboanga del Norte
: 1.40M
: 25-Feb-04
: Sept-04
: Completed
: Malangas, Zamboanga Sibuguey
: 1.50M
: 25-Feb-04
: Jun-04
: Completed
: Titay, Zamboanga Sibuguey
: 1.50M
: 25-Feb-04
: 10-Apr-04
: Completed
: Midsalip, Zamboanga del Sur
: 2.00M
: 17-Feb-04
: Sept-05
: Completed

: Construction of Guihulngan District Jail
: Suihulngan, Negros Occidental
: 1.00M
: 12-Apr-04
: 20-Aug-05
: Completed

: GLOBE
: Tabina, Zamboanga
: 1.4M
: Apr-04
: Mar-05
: Completed
: Bonifacio, Zamboanga
: 1.5M
: Apr-04
: Mar-05
: Completed
: Bayog, Zamboanga
: 1.5M
: Apr-04
: Mar-05
: Completed
: Midsalip, Zamboanga
: 2.00M
: Apr-04
: Mar-05
: Completed

: Secondary Education Building (Phase II & III)
: Don Bosco Caritas
: Laguna Technopark Binan, Laguna
: 38.80M
: 24-Sept-02
: May-03
: Completed

: Construction of Single Detach (Baltimore Model) 1
: Greenfield Development Corporation
: San Joaquin, Pasig City
: 2.00M
: 1-Aug-03
: May-05
: Completed

: Construction of Single Detach (Baltimore Model) 2
: Greenfield Development Corporation
: San Joaquin, Pasig City
: 2.00M
: Oct-03
: May-05
: Completed

: Philslife Orchid Hill Condominium
: Philslife
: Pulong Bunga, Silang, Cavite
: 15.50M
: Nov-03
: 15-July-04
: Completed

: Construction of Concrete Roads, Bridges and/or Public Buildings
: Provincial Government of Camarines Sur
: Camarines Sur
: 70.00M
: 15-Jan-04
:
: Completed

: Rehabilitation and Re-Development of Gymnasium
: Colegio De San Juan de Letran
: Calamba Laguna
: 32.7M
: 04-2006
: 10-20-2006
: Completed

: Construction of LM Seawall, 250 meters in effective Depth, 40 LM River Protection and one unit Manhole
: LOGOFIND - World Bank
: Province of Sorsogon Project
: 30.00M
: 05-2007
: 12-2007
: Completed
: Rural Health Unit
: World Bank
: Province of Sorsogon Project
: 60.00M
: 9-05-07
:
: Completed

: Construction of Philippine Veterans Bank
: Philippine Veterans Bank
: Butuan City
: 15.99M
: 09-2008
:
: Completed

: Renovation of Bangko Sentral Regional Office
: Bangko Sentral Regional Office
: Cebu City, Philippines
: 3.28M
: April 2008
:
: Completed